Maintenance, repair, and servicing of transformers in Vietnam

Maintenance, repair, and servicing of transformers in Vietnam

Maintenance and repair of transformers are essential to ensure stable and durable operation of the equipment. Regular maintenance and repair of transformers can reduce the time and cost of machine maintenance, as well as increase the lifespan and performance of the machine. Transformers are important electrical equipment in production and life, so regular maintenance, component replacement, and material replacement are crucial to ensure durability and safety during use.

Timely maintenance, repair, and servicing of transformers can help save costs and time, improve the performance and lifespan of the equipment, and ensure safety and reliability in production and business activities for customers.

Quang Anh Electrical Construction Co., Ltd is a specialized provider of maintenance, repair, and servicing of transformers for customers within and outside the region in Vietnam. With experienced technicians and modern equipment, we are committed to providing customers with high-quality services that ensure safety and meet their production and business needs.

Please contact us at Hotline: 0919758191 for consultation and support on issues related to maintenance, repair, and servicing of transformers.

Dịch vụ bảo trì trạm biến áp 

Our services include:

  • Maintenance and servicing of transformers: We provide regular maintenance packages to ensure stable operation and minimize the risk of breakdowns.
  • Repair of transformers: Our experienced technicians and modern equipment enable us to quickly diagnose and repair technical issues with transformers, ensuring they are up and running as soon as possible.
  • Upgrade and replacement of transformers: We offer solutions to upgrade and replace transformers to improve performance and save costs for our customers.

With a commitment to quality and dedicated service, we aim to become a reliable partner for customers in the field of maintenance, servicing, and repair of transformers.

Vietnam Maintenance of transformers

Maintenance, repair and upkeep of transformer

  1. Ensure safety when carrying out maintenance and repair of transformers.

Vietnam Maintenance of transformers

This is an important task that needs to be carried out to prevent accidents and minimize risks for everyone. Some contents that need to be implemented to ensure safety include:

  • When performing maintenance and repairs, the voltage transformer must be disconnected from the high-voltage grid, and the secondary circuit breakers of the voltage transformer must be in the open position.
  • All machinery and equipment must be stopped during maintenance and repair.
  • Notify everyone of the time of maintenance and repair, and have signs such as “Under maintenance, do not turn on the power.”
  • Ensure the machine is stopped before moving or opening the protective cover.
  • Keep the machine away from flammable materials and substances. Do not use gasoline, oil, and flammable substances to clean the machine.
  • Reinstall intact protective equipment and machine covers after maintenance.
  • If welding on any part of the machine, follow the instructions.
  1. Regular maintenance of voltage transformers.

Vietnam Maintenance of transformers

In fact, the repair costs due to sudden equipment failures, reduced machine life, productivity losses, etc. are much higher than maintenance costs if detected early and prevented from occurring.

Regular transformer maintenance checks will help us detect any abnormalities in the machine, thereby predicting and preventing breakdowns and machine errors before they occur by performing regular maintenance every month, 3 months, or 6 months. The goal is to be less, shorter, and able to predict the machine failure.

a. Contents of regular transformer maintenance checks

Vietnam Maintenance of transformers

Check the surface of the insulation porcelain, whether the porcelain heads have cracks, dirt, or oil leakage?

Check the MBA casing for integrity and oil leakage?

Check the color, insulation level, and oil level of the auxiliary oil tank, the insulation porcelain with oil, oil pressure in the pressure porcelain.

Check the readings of the thermometer and pressure gauge.

Check the cooling system and continuous oil regeneration equipment.

Check the operation of the Steam Relay, safety valve, explosion-proof glass tube, and the position of the valve between the steam relay and the auxiliary oil tank.

Check the signaling devices.

Check the cable heads, conductive bars, joints, and see if the contact is overheating?

Check the MBA grounding system and protection devices.

Check if the machine makes any abnormal noises?

Check the color of the moisture-absorbing beads, if it turns from pink to light yellow, replace the beads.

Check the condition of the machine room: windows, doors, ventilation holes, lighting, and protective screens.

Check the firefighting equipment.

b. Regular maintenance of the transformer:

It is maintenance and repair of MBA with power cut, but without draining the oil or opening the core. The regular minor maintenance can be performed every 3 or 6 months depending on the actual working conditions, with 3 months being the recommended interval.

The minor maintenance of MBA includes the following contents:

  • Check and repair minor damages that can be immediately fixed.
  • Clean the MBA location and its components (cooling fins, machine casing, high/low voltage insulating ceramics…).
  • Check and clean all connecting bolts, tighten nuts and screws.
  • Filter dirty oil from the auxiliary oil tank, supplement the auxiliary oil tank, flush the drain pipe, and check the oil level gauge.
  • Check the color of the desiccant beads (if it turns from pink to light yellow, replace the desiccant beads).
  • Check the operation and clean the pressure relay, safety valve, and signaling devices.
  • Check and clean the cooling system, replace the grease of the cooling system’s motor bearings.
  • Check the grounding wire connections of the MBA casing, protective and lightning devices, and ensure that the connections are secure during operation.

c. Regular major maintenance of the transformer:

Vietnam Maintenance of transformers

It is a comprehensive maintenance, inspection, and repair of the entire machine, which may include machine drying. The overhaul time depends on the machine’s performance and condition.

Transformer maintenance includes the following contents:

  • Removing the machine casing or core from the casing.
  • Checking, cleaning, and maintaining the coils and magnetic cores, including voltage regulators.
  • Cleaning and maintaining auxiliary oil tanks, explosion-proof pipes, valves, and input porcelain.
  • Repairing cooling equipment and dehumidifier tanks.
  • Cleaning and repainting the machine casing (if necessary).
  • Checking measuring instruments, signaling systems, and protective relays.
  • Repairing devices connected to the MBA.
  • Filtering or replacing oil (if necessary).
  • Drying the core of the machine (if necessary).
  • Reinstalling the machine.
  • Testing the machine and checking the results.

If you need to maintain, repair or service your transformer, please contact the following address for assistance:

QUANG ANH CONSTRUCTION ELECTRICITY COMPANY LIMITED

Address: Floor 2, I2 Building, 236/26 Dien Bien Phu Street, Ward 17, Binh Thanh District, Ho Chi Minh City

Hotline: 0919758191

Website: thicongtrambienap.com

Youtube channel: https://www.youtube.com/@xaylapienquanganh2543/videos

Tax code: 0316365712

QUANGANHCONS

Tính nhanh giá trạm biến áp

Chọn công suất và chiều dài tuyến để xem giá tham khảo cùng thông số điện.

01   Tính giá nhanh

Điều kiện tính cáp và tụ bù
Gửi yêu cầu báo giá theo thiết kế

Gửi thông tin công trình, BOQ hoặc bản vẽ để nhận báo giá chính thức. Các trường có * là bắt buộc.

Cấu hình tính nhanh gửi kèm
Chưa có kết quả tính nhanh. Bạn vẫn có thể gửi yêu cầu theo thiết kế.

Phạm vi báo giá

Áp dụng cho một trạm mua điện EVN, máy dầu 22/0,4 kV (máy một pha: 12,7/0,23 kV), TU/TI trung thế do EVN cấp. Giá gồm thiết bị theo cấu hình, lắp đặt, tiếp địa, liên kết máy–CB tổng, hồ sơ thiết kế–đấu nối và phối hợp thí nghiệm, nghiệm thu điện lực.

Kios, trụ thép hợp bộ và trạm trong nhà có tủ trung thế cùng đoạn cáp ngầm theo thông tin đã nhập. Các kiểu ngoài trời dùng phương án bảo vệ tương ứng; sơ đồ cuối cùng cần phù hợp yêu cầu đấu nối tại công trình.

Chưa gồm VAT, cáp từ tủ trạm đến MSB/phụ tải, hotline, cuộn kháng lọc hài, nền yếu/cọc đặc biệt, đất và PCCC đặc thù. Tuyến ngầm tính theo điều kiện thi công thông thường, chưa gồm khoan qua đường hoặc hoàn trả đặc biệt.

Giá dùng để tham khảo đầu tư. Báo giá chính thức được xác nhận sau khảo sát và thống nhất cấu hình. Thông số điện là lựa chọn sơ bộ, cần kiểm tra theo thiết kế trước khi thi công.

Dải công suất và điều kiện áp dụng

Danh mục là phạm vi tiếp nhận yêu cầu của công cụ, không phải giới hạn công suất chung của TCVN. Trạm treo một máy: 15–100 kVA; bộ ba máy: 3×15–3×100 kVA. Giàn: 100–630 kVA. Trụ thép: 100–630 kVA; 750/800 kVA cần xác nhận thiết kế và chấp thuận tại địa phương. Nền/kios/phòng: danh mục 50–10.000 kVA, không có nghĩa mọi cấu hình đều có giá trọn gói hoặc cùng kết cấu.

Tham khảo QĐ 1299/QĐ-EVN ngày 03/11/2017, Tập 1, mục 3.3–3.4; kiểm tra văn bản hiện hành của điện lực quản lý trước khi triển khai. Kios phải phù hợp định mức/thử nghiệm của nhà chế tạo (IEC 62271-202); phòng/nền phải đáp ứng bố trí, thông gió, kết cấu và PCCC của dự án. Công suất trạm nhiều máy phải tách số máy và công suất mỗi máy.

Công cụ do QuangAnhcons phát triển · © 2026 QuangAnhcons. Mã nguồn theo GPL-2.0-or-later; tiêu chuẩn và dữ liệu hãng thuộc chủ sở hữu tương ứng.

Yêu cầu báo giá chi tiết / gửi BOQ, bản vẽ
Nhận báo giá chi tiết và lịch khảo sát hiện trường

Quý khách vui lòng gửi thông tin dự án, BOQ hoặc bản vẽ. QuangAnhcons sẽ kiểm tra và phản hồi trong ngày hoặc chậm nhất trong vòng 48 giờ làm việc.

1. Dịch vụ / thông tin dự án

Chọn đúng hạng mục để QuangAnhcons phân luồng sales kỹ thuật và báo giá sát hơn.

2. Thông tin liên hệ

Thông tin này giúp QuangAnhcons phản hồi nhanh qua điện thoại, Zalo hoặc email.

Email công ty được ưu tiên để QuangAnhcons xác minh thông tin và phản hồi báo giá chuyên nghiệp hơn. Email cá nhân có thể cần xác nhận thêm.
Quang Anh sẽ dùng ngôn ngữ này cho email phản hồi và proposal/báo giá gửi khách.
3. Địa điểm / tiến độ công trình

Cung cấp địa điểm, mức độ cần báo giá và tiến độ hoàn thiện để ưu tiên xử lý đúng nhu cầu.

4. Nguồn điện / điều kiện triển khai

Các thông tin nền dùng chung để báo giá sát hơn trước khi vào mục kỹ thuật riêng theo dịch vụ cha/con.

Thông tin này giúp QuangAnhcons tính mùa thi công, mưa gió, tiến độ và bố trí khảo sát phù hợp.
5. Thông tin kỹ thuật chính

Mục này có thể cấu hình riêng theo từng dịch vụ cha/con trong Technical Fields.

Mục kỹ thuật riêng cho: Nâng công suất trạm biến áp
Mục kỹ thuật riêng cho: Di dời / cải tạo trạm biến áp
Mục kỹ thuật riêng cho: Bảo trì/ Bảo dưỡng trạm biến áp
Mục kỹ thuật riêng cho: Xử lý sự cố trạm biến áp
Mục kỹ thuật riêng cho: Sửa chữa máy biến áp
Mục kỹ thuật riêng cho: Thi công hệ thống cáp ngầm trung thế
Mục kỹ thuật riêng cho: Thi công đường dây trung thế nổi
Mục kỹ thuật riêng cho: Thi công ngầm hóa đường dây trung/hạ thế

Các thông tin nâng cao giúp giảm sai số khi báo giá trạm biến áp. Có thể bỏ qua nếu chưa rõ.

7. BOQ / bản vẽ / tài liệu đính kèm / hình ảnh liên quan

Đính kèm BOQ, bản vẽ, hình ảnh hiện trạng hoặc gửi link file lớn an toàn để QuangAnhcons kiểm tra nhanh.

Một vùng upload chung cho BOQ, bản vẽ, tài liệu, ảnh hiện trạng, ảnh điện thoại, CAD/BIM và file nén. Có thể chọn nhiều file, chọn thêm file lần nữa để bổ sung, bấm Xóa để bỏ từng file trước khi gửi.
Có thể chọn nhiều file, chọn thêm file lần nữa để bổ sung, bấm Xóa để bỏ từng file trước khi gửi. Hỗ trợ ảnh phổ biến, PDF, Word, Excel, PowerPoint, CAD/Revit/IFC/STEP, ZIP/RAR/7Z.
Có thể chọn nhiều file, chọn thêm file lần nữa để bổ sung, bấm Xóa để bỏ từng file trước khi gửi. Hỗ trợ ảnh phổ biến, PDF, Word, Excel, PowerPoint, CAD/Revit/IFC/STEP, ZIP/RAR/7Z.
8. Nội dung yêu cầu / ghi chú thêm

Ghi rõ yêu cầu đặc biệt, mốc tiến độ, hãng thiết bị mong muốn hoặc phạm vi cần tách giá.

Nội dung đã nhập sẽ được giữ lại sau khi gửi cho đến khi tải lại trang.