Skip to content
  • English English
    • English English
    • Tiếng Việt Tiếng Việt
    • English English
      • English English
      • Tiếng Việt Tiếng Việt
    Building Reliable Substations: Construction Services for SubstationsBuilding Reliable Substations: Construction Services for Substations
      MENUMENU
      • ABOUT US
      • OUR SERVICES
      • PROJECTS
        • SUBSTATION VIDEO
      • CAREERS
      • BLOG
      • CONTACT
        DỊCH VỤ LIÊN QUAN
        • GIÁ TRẠM BIẾN ÁP 800KVA
        • GIÁ TRẠM BIẾN ÁP 6300KVA
        • GIÁ TRẠM BIẾN ÁP 5000KVA
        • trạm trụ thép TRẠM BIẾN ÁP TRỤ THÉP ĐƠN THÂN 160KVA
        • TRẠM BIẾN ÁP TRỤ THÉP ĐƠN THÂN 630KVA
        • TRẠM BIẾN ÁP TRỤ THÉP ĐƠN THÂN 560KVA
        • TRẠM BIẾN ÁP TRỤ THÉP ĐƠN THÂN 400KVA
        • TRẠM BIẾN ÁP TRỤ THÉP ĐƠN THÂN 320KVA
        • TRẠM BIẾN ÁP TRỤ THÉP ĐƠN THÂN 250KVA
        • TRẠM BIẾN ÁP TRỤ THÉP ĐƠN THÂN 100KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 4000KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 3500KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 3200KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 3000KVA
        • gia hạn fit 2 THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 2500KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 2000KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 1600KVA
        • giá trạm biến áp THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 1500KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 1250KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 1000KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 750KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 630KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 560KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 400KVA
        • THI CÔNG TRẠM BIẾN ÁP ĐẶT NỀN 320KVA
        • THI CÔNG TRẠM BIẾN ÁP GIÀN 750KVA
        • THI CÔNG TRẠM BIẾN ÁP GIÀN 560KVA
        • THI CÔNG TRẠM BIẾN ÁP GIÀN 630KVA
        • THI CÔNG TRẠM BIẾN ÁP GIÀN 400KVA
        • THI CÔNG TRẠM BIẾN ÁP GIÀN 320KVA
        • THI CÔNG TRẠM BIẾN ÁP GIÀN 250KVA
        • vietnam substation construction THI CÔNG TRẠM BIẾN ÁP GIÀN 160KVA
        • vietnam substation construction THI CÔNG TRẠM BIẾN ÁP TREO 3x100KVA
        • vietnam substation construction THI CÔNG TRẠM BIẾN ÁP TREO 3x75KVA
        • vietnam substation construction THI CÔNG TRẠM BIẾN ÁP TREO 3x50KVA
        • vietnam substation construction THI CÔNG TRẠM BIẾN ÁP TREO 37.5KVA
        • vietnam substation construction THI CÔNG TRẠM BIẾN ÁP TREO 3x25KVA
        • single pole mounted transformer THI CÔNG TRẠM BIẾN ÁP TREO 3x15KVA
        Tin Tức Liên Quan
        • Vietnam transformer Substation Prices and Services 10 October, 2023
        • Binh Duong Factory Relocation to Industrial Clusters | Quang Anh 31 July, 2023
        • 160KVA Transformer Substation – High Efficiency and Energy Savings 27 July, 2023
        • Substation transformer construction service in Vietnam: Quang Anh 21 July, 2023
        • Services For FDI factories in Long Thanh High Tech Industrial Park 10 July, 2023
        • Turn on the electricity of the 630kva substation at Garmex factory 14 April, 2023
        • Turn on the electricity of the Bericap 2500KVA substation, Long An 13 April, 2023
        • Fast power outage handling service for 22/0.4Kv transformer substations 8 April, 2023
        • Relocation of the transformer station at 600 Dien Bien Phu 7 April, 2023
        • Kiosk Substation – Compact, Versatile, and Reliable – Quang Anh 5 April, 2023
        • Professional Medium Voltage Overhead Line Construction Services 5 April, 2023
        • Installing centrifugal concrete poles at Long Hau Industrial Park 30 March, 2023
        • All about RMU cabinets – Quang Anh Electrical Construction supplies and installs 26 March, 2023
        • Kiosk Substation – Design, Supply & Installation – Quang Anh CE 20 February, 2023
        • Maintenance, repair, and servicing of transformers in Vietnam 28 October, 2022
        • Undergrounding the power grid 24 October, 2022
        • [VIDEO] 320KVA TRANSFORMER – QUANG ANH CE 16 August, 2022
        • Construction of 22KV 630KVA transformer substation and connection line 11 July, 2022
        • Turning on the electricity of 630KVA Substation at VSIP 1 Industrial Park 21 February, 2022
        • Turn on the electricity of 400KVA Substation at Xuyen A Industrial Park 30 June, 2021
        • Turn on the electricity of the 1000KVA Transformer Subtation in Duc Hoa, Long An 7 January, 2021
        • 1250KVA Transformer Substation – Bau Bang Industrial Park 7 December, 2020
        • Turn on the electricity of the 22kV 3200KVA Substation Project 2 March, 2020
        • Miscellaneous – Substation Design Calculations 1 March, 2020
        • Civil / Structural – Substation Design Calculations 1 March, 2020
        • Electrical – Substation Design Calculations 1 March, 2020
        • System Planning – Power Substation Design Calculations 1 March, 2020
        • Electricity Turn-On of 160KVA Substation at Di Linh, Lamdong Province 21 June, 2019
        • LAWS RELATED TO THE CONSTRUCTION OF FULL SUPPLY PACKAGES IN VIETNAM 16 August, 2018
        • Song Than 1 Industrial Park 23 July, 2018
        Vietnam transformer Substation Prices and Services

        Don’t miss the opportunity to learn more about transformer substation prices and our excellent services [...]

        10
        Oct
        Binh Duong Factory Relocation to Industrial Clusters | Quang Anh

        Binh Duong will relocate thousands of factories and workshops from residential areas to industrial clusters. [...]

        31
        Jul
        160KVA Transformer Substation – High Efficiency and Energy Savings

        “Price of 160KVA Transformer Substation – High Efficiency and Energy Savings! Are you in search [...]

        27
        Jul
        Services For FDI factories in Long Thanh High Tech Industrial Park

        Infrastructure development for Long Thanh high tech industrial park On July 7th, Amata Long Thanh [...]

        10
        Jul
        CÔNG TY TNHH XÂY LẮP ĐIỆN QUANG ANH
        Turn on the electricity of the 630kva substation at Garmex factory

        Project information: Construction project of 100m 3x50mm2 24kV underground cable and 630kVA transformer station Investor: [...]

        14
        Apr
        Turn on the electricity of the Bericap 2500KVA substation, Long An

        ELECTRICAL WORK FOR NEW 2500KVA TRANSFORMER SUBSTATION AT LONG HAU INDUSTRIAL PARK Welcome to the [...]

        13
        Apr
        Fast power outage handling service for 22/0.4Kv transformer substations

        Fast power outage handling service for transformer substations Are you experiencing a power outage at [...]

        08
        Apr
        Relocation of the transformer station at 600 Dien Bien Phu

        Renovation and relocation of the transformer station at 600 Dien Bien Phu – Quanganhcons Project: [...]

        07
        Apr
        Kiosk Substation – Compact, Versatile, and Reliable – Quang Anh

        A kiosk substation, also known as a pad-mounted substation, is a type of electrical substation [...]

        05
        Apr
        Professional Medium Voltage Overhead Line Construction Services

        1. Medium voltage overhead line or overhead medium voltage line An overhead medium voltage line [...]

        05
        Apr
        • 1
        • 2
        • 3
        CONTACT

        Quang Anh CE CO.,LTD

        Office: 2nd Floor, I2 Building, 26 Dien Bien Phu Street, Ward 17, Binh Thanh District, Ho Chi Minh City, Vietnam

        Tel: 028-6272-4787

        Hotline: (+84) 91975 81 91

        Mail: sales@thicongtrambienap.com

        xây lắp điện quang anh

        MORE INFORMATION

        Website: thicongtrambienap.com

        Tax code: 0316365712

        “Energy saving is future generation investment”

        DMCA.com Protection Status

        FANPAGE

        QUANG ANH YOUTUBE CHANNEL



        Copyright 2023 © UX Themes
        • ABOUT US
        • OUR SERVICES
        • PROJECTS
          • SUBSTATION VIDEO
        • CAREERS
        • BLOG
        • CONTACT
        • Login
        • Newsletter

        Login

        Lost your password?